Home
About Us
Project Description
Gallery
Documents
Relevant Project Documents
ME476C Team Charter
ME476C Gantt Chart
ME476C Team Time Card
ME476C- First Capstone Presentation
ME476C- Second Capstone Presentation
ME476C- Third Capstone Presentation & First Prototype Demonstration
ME476C- Second Prototype Presentation
ME476C- Project Report 1
ME476C- Project Report 2
ME476C- Personal Analysis Proposal
ME476C- Structural Analysis- Top of the Robot
ME476C- Structural Analysis- Bottom of the Robot
ME476C- Electrical Analysis
ME476C- Motor Torque Analysis
ME476C- Motor Speed Analysis
ME476C- Motor Torque Analysis Code (Download)
ME476C- Lead Screw Analysis Code (Download)
ME476C- Client Motor Analysis Code (Download)
ME476C- CAD Model Rough Draft (Download)
ME476C- Refined CAD Model (Download)
ME476C- Third CAD Model Iteration (Download)
ME476C- Final CAD Model- All Files (Download)
ME476C- Final Model Engineering Drawings
ME476C- Refined Structure CAD Model (Download)
ME486C Project Management
ME486C Gantt Chart
ME486C Team Time Card (Coming Soon)
ME486C- Final QFD
ME486C- Final Bill of Materials
ME486C- Engineering Calculations Summary
ME486C- Finalized Testing Plan
ME486C- 33% Build Check Presentation
ME486C- 67% Build Check Presentation
ME486C- 100% Build Check Presentation
ME486C- Initial Testing Results Presentation
ME486C- Final Testing Results Presentation
ME486C- Final Presentation (EFest Presentation)
ME486C- Flying Squirrel Poster (EFest Poster)
ME486C- Flying Squirrel Final Report
ME486C- Flying Squirrel Final CAD Packet (Download)
ME486C- Flying Squirrel Finalized Engineering Drawings
ME486C- Operation Manual