Here is the schedule which we followed through the course of this project.

During this project, we fell a little behind during the implementation phase. As a team, we observed our schedule
and saw that we had a little bit of time to cut into.
We decided to cut the system integration phase from 10 days to 4 days. This allowed us to finish up the implementation
of the prototypes and still integrated them in the 4 days allotted.
We have also changed the first prototype to only include SML creator functionality
due to the delay. This prototype was
delivered on March 12th 2002.
Our second prototype, delivered March 21st 2002,
included all SSL functionality and SML Message creation.
After the client reviewed the second prototype we worked on the final refinement
of the project.
During the last few weeks of the semester we finalized the documentation for this project and
prepared for the Capstone presentation, which occurred on the 26th of April 2002.
The final project and documentation was given to the client on May 7, 2002.
Resources
For the development of this project, our team has identified a short list of critical
hardware
and software that will be necessary to complete the design project.
These items are:
- The SECSIMPro Software
- At least one workstation equipped with:
- Windows NT/2000
- Microsoft Visual C++
Our team has already been informed on how to obtain the Demo SECSIMPro software.
For the workstation needs, the Northern Arizona University College of Engineering
contains multiple
computers that meet these requirements and will be available for our use.