STATUS REPORT 27 Feb 1998

TASKS COMPLETED

  1. In preparation for the test document, the team compiled a complete algoritmic description of GNAT.
  2. In the process of compiling the algorithmic description, changes were made in the OMT. Other parts of the code, the GUI, Lists, and Display routines, were optimized and standardized.
  3. The first Status review was scheduled for Thursday, Mar 5, at 1 p.m.. This time was confirmed with Richard Ames.

TASKS CONTINUING

  1. All team members have returned to coding, aided by their problem descriptions.

TASKS DELAYED

  1. Implementing the network has been put on hold.

INDIVIDUAL TASKS

  1. Matt Petro developed the test plan for the GNAT GUI.
  2. Matt Ericson developed the test plan for the LIST module.
  3. Rob Waltz developed the test plan for the DISPLAY and STATISTICS modules.
  4. John Kobinski developed the test plan for the SNOOP module.
  5. Rob Waltz developed the test plan for Integration #1: LIST, DISPLAY and STATISTICS modules.
  6. Matt Ericson developed the test plan for Integration #2: Integration #1 and SNOOP module.
  7. Matt Petro developed the test plan for Integration #3: Integration #2 and the GUI.
  8. Matt Petro formatted the test plan document to standardize everyone's test plans.

TASKS STARTED

  1. The team has started preparing an agenda for the first Status review.
  2. Rob Waltz will update the OMT to reflect design changes.
  3. Matt Petro will update the schedule to reflect current status.
  4. All team members will continue to code their modules.

HOURS

Matt Ericson 27 hours
John Kobinski 20 hours
Matt Petro 28 hours
Rob Waltz 33 hours